Flint-walling CPJS Shallow Well Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
10
WELL TO PUMP CONNECTION (SUCTION PIPE)
4b. For driven wells, a check valve is required at the top of
the well to maintain prime. Flow arrow must point toward
pump. (Fig. 4b)
IL1475
Pump
Flow Arrow
4b
IL1396
2
IL1395
Tape
1
2. Finish the connection to your well with additional pipe and
ttings as needed. (Fig. 2)
1. Make the connection to your well. Wrap all threaded
ttings with pipe tape 5 times or apply a pipe paste
(pipe dope) to ensure an air tight connection. (Fig. 1)
Deep Well Application Only:
IL1397
5
5. Finish the connection to your well with additional pipe and
ttings as needed. (Fig. 5)
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 23 24

Comentarios a estos manuales

Sin comentarios